Change X-Axis?

The curve contains analysis results which will be deleted when this change is made.  Do you want to continue to change the x-axis?

This message is displayed if you have already completed at least one calibration analysis and then you select change the x-axis time. Changing the X axis to Time will cause the analysis results to be removed because you cannot perform a calibration analysis when the X axis is Time.